Stationary Precast Plants

 

Operating principle

  • Everything moves except the moulds. They stay bolted to the floor for the entire production run.
  • Materials come to each station. Reinforcement cages, inserts and concrete are brought to the mould, the concrete by mixer truck or by a hopper handled by the overhead crane.
  • Mobile workstations. Line spacing is sized so operators move freely around each mould with the equipment every operation needs.
  • On-site curing. After concreting, each mould is covered with insulating tarpaulins and heated until the segment reaches enough strength to be demoulded, then handled.

 

Key benefits

  • Simple and robust: no carousel, no conveying system to maintain
  • Lower mechanical investment and fast, uncomplicated set-up and maintenance
  • Capacity scaled to your drive by adding or removing mould lines
  • Ergonomic stations optimised for operation, cleaning and maintenance
  • Worker safety and handling organisation engineered in from the layout stage

Proyectos
Sácale más partido a nuestro sitio web usando cookies.

Nuestro sitio web utiliza cookies para, entre otras cosas, brindarte la mejor experiencia de usuario y realizar un seguimiento de las estadísticas de visitas.

Acepto todas las cookies Rechazar las cookies Configura tus preferencias